Skip to main content
Home Home
AusConnect
connecting people and partners across the Australian Development Program

Breadcrumb

  1. Home
  2. Opportunities Archive
Adam Smith International

Bloody Ridge National Park Construction EOI

Posted
8 April 2025 10:42am
Apply by
22/04/2025
Regions
Pacific
Sectors
Infrastructure and Trade Facilitation
Summary

Subject: Invitation to Submit an Expression of Interest (EOI) for the construction of key infrastructure at the
Bloody Ridge National Park


Introduction
The Ministry of Culture and Tourism (MCT) of the Solomon Islands and Australia’s Strongim Bisnis invites your esteemed company to submit an Expression of Interest (EOI) for the construction of key infrastructure at the Bloody Ridge National Park. This project aims to enhance the historical significance of the site while providing modern facilities to visitors.


Project Overview
The Bloody Ridge National Park is undergoing a significant development phase that includes the construction of key infrastructure:
1. Water Supply (borehole with water tower)
2. Visitor Ablution Block
3. Visitor Shelters
4. Guardhouse/Park office

Scope of Work
The selected construction firm will be responsible for:
1. Site preparation: Clearing and leveling designated areas, ensuring proper groundwork for construction in accordance with project specifications.
2. Foundation and structural work: Excavating, pouring concrete, and constructing structural element as per the approved building plans.
3. Building construction: Assembling and erecting buildings and facilities using specified materials and construction methods.
4. Adherence to plans and standards: Following architectural and engineering designs, ensuring compliance with building codes, safety regulations, and MCT’s specifications.
5. Project cleanup and handover: Removing construction debris, conducting final inspections, and ensuring the site is ready for use upon project completion.
6. Cultural and historical sensitivity: Constructing facilities with respect to the historical significance of Bloody Ridge National Park, following guidelines that preserve its heritage.

Key Deliverables
• Water Supply: Installation of a borehole and water tower connected to the security hut and ablution block. (Note: The borehole drilling will be done by the Ministry of Mines, Energy & Rural Electrification in collaboration with the Ministry of Culture and Tourism).
• Visitor Ablution Block: A well-constructed, visually attractive restroom facility with appropriate plumbing and sanitation systems.
• Two large Visitor Shelters: Sturdy, weather-resistant shelters designed to provide shade and comfort for park visitors.
• Guardhouse/Park office with adjoining restroom: A secure, durable structure to accommodate park rangers, ensuring controlled access and site safety.

 

 

See full details
DT Global

Consultancy Services for Disability Research Study

Posted
14 March 2025 12:28pm
Apply by
22/04/2025
Regions
Pacific
Sectors
Infrastructure and Trade Facilitation
Summary

Location: Port Moresby, Papua New Guinea

See full details
Palladium International

MEL Coordinator – International Scholarship Program

Posted
2 April 2025 02:35pm
Apply by
22/04/2025
Regions
Pacific
Sectors
Education
Summary

MEL Coordinator – International Scholarship Program

  • Fixed term contract up to 30 June 2029
  • Monitoring & Evaluation, Performance & Quality
  • Competitive salary and flexible work options
  • Canberra based 
See full details
DT Global

Gender Equality, Disability and Social Inclusion Policy and Program Officer (multiple positions)

Posted
3 October 2024 06:23pm
Apply by
18/10/2024
Regions
Pacific
Sectors
Effective Governance
Summary
  • Australian citizenship.
  • Fixed term full time contract to July 2025, with possibility of an extension.
  • Canberra based is ideal but remote candidates will also be considered.
  • A current security clearance is required for this position. A baseline clearance may be considered for Canberra based office work, but NV1/2 preferred and required for remote work.
  • Salary banding in accordance with EL1/APS6 Level.
  • Ability to travel internationally (as required).
  • Occasional out of hours work may be required.
  • Remote/flexible work arrangement may be work may be considered.
See full details
DT Global

MIS Consultant

Posted
27 September 2024 05:26pm
Apply by
18/10/2024
Regions
Pacific
Sectors
Administration
Communications
Operations
Summary

To enable effective CRC management and implementation, CRCSU plans to scope, develop and implement an interactive Management Information System (MIS) to facilitate, day-to-day operations, analysis and dissemination of data to DFAT and other key stakeholders as well as support efficient management and implementation of the CRC and CRCSU.

See full details
Abt Global

Operations and Security Manager| PIPP

Posted
3 October 2024 09:50am
Apply by
18/10/2024
Regions
Pacific
Sectors
Operations
Summary

Abt Associates is seeking a highly qualified individual to fill the Operations & Security Manager role on the Papua New Guinea Institutional Partnerships Program (PIPP) Program. This role is based in Port Moresby, Papua New Guinea and open to PNG citizens.

See full details
DT Global

Partnership Pillar Lead

Posted
1 October 2024 07:28pm
Apply by
18/10/2024
Regions
Pacific
South-East and East Asia
Sectors
Effective Governance
Summary

Location

Canberra, Australia based with travel in Southeast Asia required 

Duration 

2 years with the possibility of extension 

Supervisor/Manager 

Partnerships Manager 

Performance Management and Reporting Framework 

DFAT Adviser Performance Assessment and relevant program reporting framework.

Deadline for Application

Tuesday 15th October 2024, 11:59, AEST

See full details

Advanced Search

Regions

  • (-) Pacific
  • South-East and East Asia

Countries

  • Australia
  • Papua New Guinea
  • Solomon Islands

Sector

  • Administration
  • Communications
  • Education
  • Effective Governance
  • Infrastructure and Trade Facilitation
  • Operations

Skillsets

  • Construction
  • Disability
  • Gender
  • Governance
  • Humanitarian/Emergency
  • Monitoring and Evaluation
  • Social Inclusion
  • Team Leader

Contract type

  • Employing
  • Sub-contracting

Work arrangements

  • Flexible
  • Fly-in-Fly-out
  • In country

Work type

  • Full-time

Close date

  • 2025-06-06
  • 2025-06-05
  • 2025-06-04
  • 2025-06-01
  • 2025-05-30
  • 2025-05-29
  • 2025-05-28
  • 2025-05-26
  • 2025-05-25
  • 2025-05-23
  • 2025-05-22
  • 2025-05-21
  • 2025-05-20
  • 2025-05-19
  • 2025-05-15
  • 2025-05-14
  • 2025-05-13
  • 2025-05-12
  • 2025-05-11
  • 2025-05-10
  • 2025-05-08
  • 2025-05-06
  • 2025-05-05
  • 2025-05-02
  • 2025-05-01
  • 2025-04-30
  • 2025-04-29
  • 2025-04-28
  • 2025-04-27
  • 2025-04-25
  • 2025-04-24
  • 2025-04-23
  • (-) 2025-04-22
  • 2025-04-20
  • 2025-04-18
  • 2025-04-17
  • 2025-04-15
  • 2025-04-14
  • 2025-04-11
  • 2025-04-10
  • 2025-04-09
  • 2025-04-08
  • 2025-04-06
  • 2025-04-03
  • 2025-04-02
  • 2025-04-01
  • 2025-03-31
  • 2025-03-30
  • 2025-03-28
  • 2025-03-27
  • 2025-03-26
  • 2025-03-25
  • 2025-03-21
  • 2025-03-20
  • 2025-03-18
  • 2025-03-17
  • 2025-03-15
  • 2025-03-14
  • 2025-03-12
  • 2025-03-11
  • 2025-03-09
  • 2025-03-06
  • 2025-03-05
  • 2025-03-04
  • 2025-03-02
  • 2025-02-28
  • 2025-02-27
  • 2025-02-26
  • 2025-02-24
  • 2025-02-23
  • 2025-02-21
  • 2025-02-19
  • 2025-02-18
  • 2025-02-16
  • 2025-02-15
  • 2025-02-14
  • 2025-02-13
  • 2025-02-12
  • 2025-02-11
  • 2025-02-10
  • 2025-02-09
  • 2025-02-07
  • 2025-02-06
  • 2025-02-05
  • 2025-02-03
  • 2025-02-02
  • 2025-01-31
  • 2025-01-30
  • 2025-01-29
  • 2025-01-28
  • 2025-01-27
  • 2025-01-26
  • 2025-01-25
  • 2025-01-24
  • 2025-01-22
  • 2025-01-19
  • 2025-01-17
  • 2025-01-15
  • 2025-01-13
  • 2025-01-12
  • 2025-01-10
  • 2025-01-08
  • 2025-01-05
  • 2025-01-04
  • 2025-01-03
  • 2025-01-01
  • 2024-12-27
  • 2024-12-24
  • 2024-12-22
  • 2024-12-15
  • 2024-12-13
  • 2024-12-12
  • 2024-12-11
  • 2024-12-10
  • 2024-12-09
  • 2024-12-08
  • 2024-12-07
  • 2024-12-06
  • 2024-12-05
  • 2024-12-04
  • 2024-12-03
  • 2024-12-01
  • 2024-11-29
  • 2024-11-28
  • 2024-11-27
  • 2024-11-26
  • 2024-11-25
  • 2024-11-24
  • 2024-11-22
  • 2024-11-21
  • 2024-11-20
  • 2024-11-19
  • 2024-11-17
  • 2024-11-15
  • 2024-11-14
  • 2024-11-13
  • 2024-11-11
  • 2024-11-10
  • 2024-11-09
  • 2024-11-04
  • 2024-11-03
  • 2024-11-01
  • 2024-10-31
  • 2024-10-30
  • 2024-10-28
  • 2024-10-27
  • 2024-10-23
  • 2024-10-22
  • 2024-10-20
  • (-) 2024-10-18
  • 2024-10-16
  • 2024-10-15
  • 2024-10-14
  • 2024-10-13
  • 2024-10-11
  • 2024-10-10
  • 2024-10-08
  • 2024-10-07
  • 2024-10-06
  • 2024-10-04
  • 2024-10-03
  • 2024-10-01
  • 2024-09-30
  • 2024-09-29
  • 2024-09-20
  • 2024-09-19
  • 2024-09-18
  • 2024-09-17
  • 2024-09-16
  • 2024-09-13
  • 2024-09-06
  • 2024-09-04
  • 2024-09-01
  • 2024-08-31
  • 2024-08-28
  • 2024-08-27
  • 2024-08-26
  • 2024-08-23
  • 2024-08-21
  • 2024-08-15
  • 2024-08-14
  • 2024-08-10
  • 2024-08-09
  • 2024-08-08
  • 2024-08-07
  • 2024-08-04
  • 2024-08-01
  • 2024-07-31
  • 2024-07-29
  • 2024-07-28
  • 2024-07-26
  • 2024-07-23
  • 2024-07-17
  • 2024-07-16
  • 2024-07-15
  • 2024-07-14
  • 2024-07-12
  • 2024-07-10
  • 2024-07-08
  • 2024-07-07
  • 2024-07-05
  • 2024-07-03
  • 2024-07-02
  • 2024-07-01
  • 2024-06-30
  • 2024-06-26
  • 2024-06-24
  • 2024-06-22
  • 2024-06-21
  • 2024-06-20
  • 2024-06-19
  • Reset

Main navigation

  • FAQs
  • Advertise an opportunity
  • LinkedIn DFAT Supplier Network
  • Contact us

User account menu

  • Log in