Objective of the Assignment
To engage a qualified consulting firm to deliver a detailed design for SolTuna’s transition to biomass-based energy. This includes technical specifications for a biomass boiler system, a supply and logistics strategy (including backup sources), energy efficiency measures, and infrastructure design to support future integration of biomass-powered electricity and solar energy. The outputs
will guide SolTuna’s investment planning and procurement.
Scope of Work
The consultant will carry out the following activities:
3.1. Biomass Supply Assessment
- Identify and evaluate multiple biomass supply sources within Solomon Islands and the broader region, with emphasis on plantation by-products. Include both primary suppliers (e.g., KFPL) and backup options.
- Assess volumes, sustainability, delivered costs, storage needs, and risks associated with sole-supplier dependence.
- Develop recommendations for diversified sourcing strategies and outline systems for ongoing supply monitoring (e.g., residue trials, periodic volume assessments).
3.2. Boiler System Design
- Analyse SolTuna’s steam demand and load profile.
- Specify a dual-fuel boiler system (biomass with diesel backup) to ensure energy continuity during biomass shortages or quality issues. If dual-fuel systems are not viable, assess options for integrating SolTuna’s existing boilers as backup, either in place or relocated to the new site.
- Ensure the system design includes scrubber or filtration technology capable of meeting Australian air quality standards for particulates and odours, due to the site’s proximity to residential areas.
- Assess ground elevation and readiness, proposing earthworks or site prep as needed.
- Incorporate buffer tanks or heat dump systems to manage load variations.
- Evaluate alternative fuel handling options (e.g., conveyor vs. manual systems) for practicality and cost-efficiency.
3.3. Power Generation Integration (Optional/Phased)
- Evaluate feasibility and staging of biomass-powered electricity generation.• Include scenarios for supplying both SolTuna and the nearby NFD Kitano site, with economic comparison to current electricity and diesel costs.
- Consider future integration with solar PV and recommend site design features to accommodate hybrid systems.
3.4. Infrastructure & Expansion Planning
- Design scalable systems suitable for phased implementation, including power generation.
- Align proposed infrastructure with existing facility layout and future expansions.
- Integrate drainage and climate-resilient design principles.
- Address health and safety concerns due to limited site access, including implications for emergency response (medical, fire, earthquake/tsunami evacuation) and propose corresponding design mitigation measures.
3.5. Energy Efficiency Strategy
- Identify energy efficiency upgrades, including condensate return and load-reduction options.
- Recommend design elements that reduce required boiler/generator capacity.
3.6. Financial Analysis & Planning
- Provide indicative capital and operational costs for each key system element.
- Compare technical options (e.g., different boilers, feed systems) and recommend based on ROI, lifecycle costs, and system performance.
- Include financial modelling, payback periods, sensitivity analyses, and cost exclusion risks (e.g., civil works, solar integration).
- Where feasible, offer comparative estimates for turnkey vs. custom-build options.
3.7. Documentation for Procurement
- Deliver draft technical specifications and procurement guidance, sufficient to inform investment and tender preparation. If required to manage costs, this section may be scaled back to concept-level design documentation with clear guidance on next steps.
- Include:
- Equipment technical specs
- Fuel system layout options
Deliverables
The consultant will be expected to deliver the following:
Outlining methodology, data needs, timeline, and stakeholder engagement approach.
- Biomass Supply & Logistics Report
Assessing available feedstock options, delivery risks, backup supply strategies, and recommended sourcing approach.
- Boiler and Infrastructure Design Report
Including system specifications, layout plans, site readiness assessment, dual-fuel options, and expansion planning.
- Power Generation Feasibility Report
Evaluating staged integration of biomass-powered electricity and solar, including potential to supply other nearby sites.
- Energy Efficiency & Safety Recommendations
Proposing efficiency upgrades and addressing health, safety, and emergency response considerations at the proposed site.
- Financial Analysis Report
Presenting indicative capital and operating costs, comparative system options, and key financial indicators (ROI, payback, lifecycle costs).
- Final Technical Report & Presentation
Consolidated findings with practical recommendations, delivered to SolTuna and relevant stakeholders.
Duration and Timeline
The assignment is expected to run for 6 months, beginning in September 2025, with the final report delivered by end of February 2026.
Instruction to Bidders
Proposals should clearly set out how the consultancy will deliver the Scope of Work outlined in Section 3. Bidders are requested to include the following information in their submission:
- Approach and Methodology
- Description of how the consultancy team will carry out each activity under the Scope of Work.
- Proposed timeline and work plan, including milestones and key deliverables.
- Details of any assumptions, risks, or constraints.
- The full proposal, including all required sections, should not exceed 15 pages in total. This excludes annexes or supporting documents (e.g. CVs, certificates), which may be attached separately if required.
2. Team Composition and Roles• Names and roles of personnel who will undertake the assignment.
- Relevant qualifications and experience for each team member.
- Expected level of effort (number of days) per team member.
3. Logistics and Travel
- Proposed arrangements for travel to the Solomon Islands, including timing, duration, and number of staff to be present in-country.
4. Financial Proposal
- A total cost inclusive of professional fees, travel, accommodation, and all related expenses.
- A breakdown of costs by activity or work package.
- Proposed payment schedule, structured against 3–6 milestone deliverables, showing the percentage of the contract value to be paid at each stage.
Please note that Strongim Bisnis will not reimburse, compensate, or otherwise cover any costs incurred by bidders in the preparation or submission of their proposals. All expenses related to this process are the sole responsibility of the bidder.
5. Company Information
- Brief background of the company/consortium, including relevant experience with similar assignments.
- Contact details of the lead consultant/firm.