Skip to main content
Home Home
AusConnect
connecting people and partners across the Australian Development Program

Breadcrumb

  1. Home
  2. Opportunities Archive
Adam Smith International

Bloody Ridge National Park Construction EOI

Posted
8 April 2025 10:42am
Apply by
22/04/2025
Regions
Pacific
Sectors
Infrastructure and Trade Facilitation
Summary

Subject: Invitation to Submit an Expression of Interest (EOI) for the construction of key infrastructure at the
Bloody Ridge National Park


Introduction
The Ministry of Culture and Tourism (MCT) of the Solomon Islands and Australia’s Strongim Bisnis invites your esteemed company to submit an Expression of Interest (EOI) for the construction of key infrastructure at the Bloody Ridge National Park. This project aims to enhance the historical significance of the site while providing modern facilities to visitors.


Project Overview
The Bloody Ridge National Park is undergoing a significant development phase that includes the construction of key infrastructure:
1. Water Supply (borehole with water tower)
2. Visitor Ablution Block
3. Visitor Shelters
4. Guardhouse/Park office

Scope of Work
The selected construction firm will be responsible for:
1. Site preparation: Clearing and leveling designated areas, ensuring proper groundwork for construction in accordance with project specifications.
2. Foundation and structural work: Excavating, pouring concrete, and constructing structural element as per the approved building plans.
3. Building construction: Assembling and erecting buildings and facilities using specified materials and construction methods.
4. Adherence to plans and standards: Following architectural and engineering designs, ensuring compliance with building codes, safety regulations, and MCT’s specifications.
5. Project cleanup and handover: Removing construction debris, conducting final inspections, and ensuring the site is ready for use upon project completion.
6. Cultural and historical sensitivity: Constructing facilities with respect to the historical significance of Bloody Ridge National Park, following guidelines that preserve its heritage.

Key Deliverables
• Water Supply: Installation of a borehole and water tower connected to the security hut and ablution block. (Note: The borehole drilling will be done by the Ministry of Mines, Energy & Rural Electrification in collaboration with the Ministry of Culture and Tourism).
• Visitor Ablution Block: A well-constructed, visually attractive restroom facility with appropriate plumbing and sanitation systems.
• Two large Visitor Shelters: Sturdy, weather-resistant shelters designed to provide shade and comfort for park visitors.
• Guardhouse/Park office with adjoining restroom: A secure, durable structure to accommodate park rangers, ensuring controlled access and site safety.

 

 

See full details
DT Global

Consultancy Services for Disability Research Study

Posted
14 March 2025 12:28pm
Apply by
22/04/2025
Regions
Pacific
Sectors
Infrastructure and Trade Facilitation
Summary

Location: Port Moresby, Papua New Guinea

See full details
Cowater International

Monitoring, Evaluation, Research and Learning (MERL) Portfolio Manager

Posted
20 February 2025 05:17pm
Apply by
07/03/2025
Regions
South and West Asia
Sectors
Agriculture and Rural Development
Communications
Effective Governance
Infrastructure and Trade Facilitation
Multisector
Summary

KEY INFORMATION
Job Title: Monitoring, Evaluation, Research and Learning (MERL) Portfolio Manager
Sector: Monitoring and Evaluation
Position Type: Full-time
Duration/Level of Effort: Full-term
Position Location: Phnom Penh, Cambodia
Contractual arrangement: Eligible for Cambodian residents/citizens only
 
SUMMARY OF THE PROJECT
Are you a collaborative and driven professional who thrives in a fast-paced environment? Are you eager to grow your expertise and make a meaningful impact in the development sector? Join our dynamic team as a MERL Portfolio Manager, where you'll play a key role in driving evidence-based decision-making and fostering positive change.
 
The CAPRED Facility is Australia’s flagship bilateral economic development program in Cambodia, focusing on economic recovery and resilience over the next four years, with a possible three-year extension.
 
The Facility supports Cambodia in implementing a range of necessary economic interventions and reforms to maintain the country’s economic transition. These interventions and reforms are primarily aimed at encouraging more productive and inclusive public and private investment, which promotes a resilient, inclusive and sustainable economy (RISE).
 
CAPRED interventions fall under three technical components including: Agriculture and Agro-processing; Trade, Investment and Enterprise Development and Infrastructure Development; and one Cross-Cutting component comprising: Gender Equality, Disability and Social Inclusion (GEDSI), Climate Resilient initiatives, and policy support. and policy support. GEDSI is at the heart of all that CAPRED does.

See full details

Advanced Search

Regions

  • Pacific
  • South and West Asia

Countries

  • Cambodia
  • Papua New Guinea
  • Solomon Islands

Sector

  • Agriculture and Rural Development
  • Communications
  • Education
  • Effective Governance
  • (-) Infrastructure and Trade Facilitation
  • Multisector

Skillsets

  • Construction
  • Disability
  • Humanitarian/Emergency
  • Monitoring and Evaluation

Contract type

  • Employing
  • Sub-contracting

Work arrangements

  • In country

Work type

  • Full-time

Close date

  • 2025-06-06
  • 2025-06-05
  • 2025-06-04
  • 2025-06-03
  • 2025-05-30
  • 2025-05-29
  • 2025-05-27
  • 2025-05-20
  • 2025-05-19
  • 2025-05-14
  • 2025-05-12
  • 2025-05-11
  • 2025-05-10
  • 2025-05-08
  • 2025-05-05
  • 2025-05-02
  • 2025-04-30
  • 2025-04-28
  • 2025-04-27
  • 2025-04-26
  • 2025-04-23
  • (-) 2025-04-22
  • 2025-04-15
  • 2025-04-11
  • 2025-04-10
  • 2025-04-08
  • 2025-04-07
  • 2025-04-06
  • 2025-04-04
  • 2025-04-01
  • 2025-03-31
  • 2025-03-28
  • 2025-03-18
  • 2025-03-14
  • 2025-03-09
  • (-) 2025-03-07
  • 2025-03-04
  • 2025-02-28
  • 2025-02-27
  • 2025-02-23
  • 2025-02-21
  • 2025-02-20
  • 2025-02-18
  • 2025-02-17
  • 2025-02-14
  • 2025-02-13
  • 2025-02-10
  • 2025-02-09
  • 2025-02-08
  • 2025-02-07
  • 2025-02-04
  • 2025-02-03
  • 2025-01-31
  • 2025-01-30
  • 2025-01-26
  • 2025-01-25
  • 2025-01-24
  • 2025-01-20
  • 2025-01-13
  • 2025-01-12
  • 2025-01-10
  • 2025-01-08
  • 2025-01-06
  • 2025-01-04
  • 2024-12-31
  • 2024-12-24
  • 2024-12-16
  • 2024-12-13
  • 2024-12-08
  • 2024-12-06
  • 2024-12-05
  • 2024-12-03
  • 2024-12-01
  • 2024-11-29
  • 2024-11-28
  • 2024-11-27
  • 2024-11-20
  • 2024-11-17
  • 2024-11-15
  • 2024-11-13
  • 2024-11-12
  • 2024-11-11
  • 2024-11-03
  • 2024-10-31
  • 2024-10-30
  • 2024-10-21
  • 2024-10-20
  • 2024-10-15
  • 2024-10-14
  • 2024-10-13
  • 2024-10-09
  • 2024-09-29
  • 2024-09-20
  • 2024-09-19
  • 2024-09-16
  • 2024-09-15
  • 2024-09-09
  • 2024-09-08
  • 2024-09-06
  • 2024-09-04
  • 2024-09-01
  • 2024-08-31
  • 2024-08-26
  • 2024-08-21
  • 2024-08-19
  • 2024-08-15
  • 2024-08-14
  • 2024-08-10
  • 2024-08-08
  • 2024-08-07
  • 2024-08-04
  • 2024-07-29
  • 2024-07-28
  • 2024-07-26
  • 2024-07-24
  • 2024-07-23
  • 2024-07-21
  • 2024-07-10
  • 2024-07-05
  • 2024-07-03
  • 2024-07-01
  • 2024-06-30
  • 2024-06-24
  • 2024-06-21
  • Reset

Main navigation

  • FAQs
  • Advertise an opportunity
  • LinkedIn DFAT Supplier Network
  • Contact us

User account menu

  • Log in