Skip to main content
Home Home
AusConnect
connecting people and partners across the Australian Development Program

Breadcrumb

  1. Home
  2. Opportunities Archive
Adam Smith International

Bloody Ridge National Park Construction EOI

Posted
8 April 2025 10:42am
Apply by
22/04/2025
Regions
Pacific
Sectors
Infrastructure and Trade Facilitation
Summary

Subject: Invitation to Submit an Expression of Interest (EOI) for the construction of key infrastructure at the
Bloody Ridge National Park


Introduction
The Ministry of Culture and Tourism (MCT) of the Solomon Islands and Australia’s Strongim Bisnis invites your esteemed company to submit an Expression of Interest (EOI) for the construction of key infrastructure at the Bloody Ridge National Park. This project aims to enhance the historical significance of the site while providing modern facilities to visitors.


Project Overview
The Bloody Ridge National Park is undergoing a significant development phase that includes the construction of key infrastructure:
1. Water Supply (borehole with water tower)
2. Visitor Ablution Block
3. Visitor Shelters
4. Guardhouse/Park office

Scope of Work
The selected construction firm will be responsible for:
1. Site preparation: Clearing and leveling designated areas, ensuring proper groundwork for construction in accordance with project specifications.
2. Foundation and structural work: Excavating, pouring concrete, and constructing structural element as per the approved building plans.
3. Building construction: Assembling and erecting buildings and facilities using specified materials and construction methods.
4. Adherence to plans and standards: Following architectural and engineering designs, ensuring compliance with building codes, safety regulations, and MCT’s specifications.
5. Project cleanup and handover: Removing construction debris, conducting final inspections, and ensuring the site is ready for use upon project completion.
6. Cultural and historical sensitivity: Constructing facilities with respect to the historical significance of Bloody Ridge National Park, following guidelines that preserve its heritage.

Key Deliverables
• Water Supply: Installation of a borehole and water tower connected to the security hut and ablution block. (Note: The borehole drilling will be done by the Ministry of Mines, Energy & Rural Electrification in collaboration with the Ministry of Culture and Tourism).
• Visitor Ablution Block: A well-constructed, visually attractive restroom facility with appropriate plumbing and sanitation systems.
• Two large Visitor Shelters: Sturdy, weather-resistant shelters designed to provide shade and comfort for park visitors.
• Guardhouse/Park office with adjoining restroom: A secure, durable structure to accommodate park rangers, ensuring controlled access and site safety.

 

 

See full details
DT Global

Consultancy Services for Disability Research Study

Posted
14 March 2025 12:28pm
Apply by
22/04/2025
Regions
Pacific
Sectors
Infrastructure and Trade Facilitation
Summary

Location: Port Moresby, Papua New Guinea

See full details
Adam Smith International

Climate Mitigation Infrastructure Specialist

Posted
30 October 2024 02:40pm
Apply by
12/11/2024
Regions
South-East and East Asia
Sectors
Infrastructure and Trade Facilitation
Summary

Position

Climate Mitigation Infrastructure Specialist

Duration

Short-term (80 days utilised at 1.5 days per week between 1 December 2024 – 30 December 2025)

Location

Remote with occasional travel

Reports to

P4I’s Director of Climate and Inclusion

Closing date

12 Nov 2024

About P4I

Partnerships for Infrastructure (P4I) is an Australian Government initiative partnering with Southeast Asia to drive sustainable, inclusive, and resilient growth through quality infrastructure. P4I partners with Cambodia, Indonesia, Laos, Malaysia, Philippines, Thailand, Timor-Leste, Vietnam and the Association of Southeast Asian Nations (ASEAN).

P4I works with partners to strengthen infrastructure decision-making and practice across the transport, energy, utilities and telecommunications sectors. P4I’s focus is on the early stages of the infrastructure lifecycle, including planning and prioritisation, financing strategy, and procurement.

The four primary services offered by P4I are linkages with Australian government agencies and other institutions, technical and policy advice, infrastructure project advice and knowledge-sharing and learning. As the foundation of quality infrastructure, P4I also integrates gender equality, disability, social inclusion, disaster risk reduction and climate change considerations into all activities.

Delivered through a single team, P4I is led by the Australian Department of Foreign Affairs and Trade (DFAT) in collaboration with EY, Adam Smith International, The Asia Foundation and Ninti One. P4I has a regional head office in Bangkok, with staff also located in Australia and each partner country

See full details

Advanced Search

Regions

  • Pacific
  • South-East and East Asia

Countries

  • Cambodia
  • Indonesia
  • Laos
  • Papua New Guinea
  • Philippines
  • Solomon Islands
  • Thailand
  • Vietnam

Sector

  • Education
  • Effective Governance
  • (-) Infrastructure and Trade Facilitation

Skillsets

  • Construction
  • Disability
  • Environment/Water
  • Humanitarian/Emergency

Contract type

  • Employing
  • Sub-contracting

Work arrangements

  • Flexible
  • In country

Work type

  • Full-time
  • Part-time

Close date

  • 2025-06-06
  • 2025-06-05
  • 2025-06-04
  • 2025-06-03
  • 2025-05-30
  • 2025-05-29
  • 2025-05-27
  • 2025-05-20
  • 2025-05-19
  • 2025-05-14
  • 2025-05-12
  • 2025-05-11
  • 2025-05-10
  • 2025-05-08
  • 2025-05-05
  • 2025-05-02
  • 2025-04-30
  • 2025-04-28
  • 2025-04-27
  • 2025-04-26
  • 2025-04-23
  • (-) 2025-04-22
  • 2025-04-15
  • 2025-04-11
  • 2025-04-10
  • 2025-04-08
  • 2025-04-07
  • 2025-04-06
  • 2025-04-04
  • 2025-04-01
  • 2025-03-31
  • 2025-03-28
  • 2025-03-18
  • 2025-03-14
  • 2025-03-09
  • 2025-03-07
  • 2025-03-04
  • 2025-02-28
  • 2025-02-27
  • 2025-02-23
  • 2025-02-21
  • 2025-02-20
  • 2025-02-18
  • 2025-02-17
  • 2025-02-14
  • 2025-02-13
  • 2025-02-10
  • 2025-02-09
  • 2025-02-08
  • 2025-02-07
  • 2025-02-04
  • 2025-02-03
  • 2025-01-31
  • 2025-01-30
  • 2025-01-26
  • 2025-01-25
  • 2025-01-24
  • 2025-01-20
  • 2025-01-13
  • 2025-01-12
  • 2025-01-10
  • 2025-01-08
  • 2025-01-06
  • 2025-01-04
  • 2024-12-31
  • 2024-12-24
  • 2024-12-16
  • 2024-12-13
  • 2024-12-08
  • 2024-12-06
  • 2024-12-05
  • 2024-12-03
  • 2024-12-01
  • 2024-11-29
  • 2024-11-28
  • 2024-11-27
  • 2024-11-20
  • 2024-11-17
  • 2024-11-15
  • 2024-11-13
  • (-) 2024-11-12
  • 2024-11-11
  • 2024-11-03
  • 2024-10-31
  • 2024-10-30
  • 2024-10-21
  • 2024-10-20
  • 2024-10-15
  • 2024-10-14
  • 2024-10-13
  • 2024-10-09
  • 2024-09-29
  • 2024-09-20
  • 2024-09-19
  • 2024-09-16
  • 2024-09-15
  • 2024-09-09
  • 2024-09-08
  • 2024-09-06
  • 2024-09-04
  • 2024-09-01
  • 2024-08-31
  • 2024-08-26
  • 2024-08-21
  • 2024-08-19
  • 2024-08-15
  • 2024-08-14
  • 2024-08-10
  • 2024-08-08
  • 2024-08-07
  • 2024-08-04
  • 2024-07-29
  • 2024-07-28
  • 2024-07-26
  • 2024-07-24
  • 2024-07-23
  • 2024-07-21
  • 2024-07-10
  • 2024-07-05
  • 2024-07-03
  • 2024-07-01
  • 2024-06-30
  • 2024-06-24
  • 2024-06-21
  • Reset

Main navigation

  • FAQs
  • Advertise an opportunity
  • LinkedIn DFAT Supplier Network
  • Contact us

User account menu

  • Log in