Skip to main content
Home Home
AusConnect
connecting people and partners across the Australian Development Program

Breadcrumb

  1. Home
  2. Opportunities Archive
Adam Smith International

Bloody Ridge National Park Construction EOI

Posted
8 April 2025 10:42am
Apply by
22/04/2025
Regions
Pacific
Sectors
Infrastructure and Trade Facilitation
Summary

Subject: Invitation to Submit an Expression of Interest (EOI) for the construction of key infrastructure at the
Bloody Ridge National Park


Introduction
The Ministry of Culture and Tourism (MCT) of the Solomon Islands and Australia’s Strongim Bisnis invites your esteemed company to submit an Expression of Interest (EOI) for the construction of key infrastructure at the Bloody Ridge National Park. This project aims to enhance the historical significance of the site while providing modern facilities to visitors.


Project Overview
The Bloody Ridge National Park is undergoing a significant development phase that includes the construction of key infrastructure:
1. Water Supply (borehole with water tower)
2. Visitor Ablution Block
3. Visitor Shelters
4. Guardhouse/Park office

Scope of Work
The selected construction firm will be responsible for:
1. Site preparation: Clearing and leveling designated areas, ensuring proper groundwork for construction in accordance with project specifications.
2. Foundation and structural work: Excavating, pouring concrete, and constructing structural element as per the approved building plans.
3. Building construction: Assembling and erecting buildings and facilities using specified materials and construction methods.
4. Adherence to plans and standards: Following architectural and engineering designs, ensuring compliance with building codes, safety regulations, and MCT’s specifications.
5. Project cleanup and handover: Removing construction debris, conducting final inspections, and ensuring the site is ready for use upon project completion.
6. Cultural and historical sensitivity: Constructing facilities with respect to the historical significance of Bloody Ridge National Park, following guidelines that preserve its heritage.

Key Deliverables
• Water Supply: Installation of a borehole and water tower connected to the security hut and ablution block. (Note: The borehole drilling will be done by the Ministry of Mines, Energy & Rural Electrification in collaboration with the Ministry of Culture and Tourism).
• Visitor Ablution Block: A well-constructed, visually attractive restroom facility with appropriate plumbing and sanitation systems.
• Two large Visitor Shelters: Sturdy, weather-resistant shelters designed to provide shade and comfort for park visitors.
• Guardhouse/Park office with adjoining restroom: A secure, durable structure to accommodate park rangers, ensuring controlled access and site safety.

 

 

See full details
DT Global

Consultancy Services for Disability Research Study

Posted
14 March 2025 12:28pm
Apply by
22/04/2025
Regions
Pacific
Sectors
Infrastructure and Trade Facilitation
Summary

Location: Port Moresby, Papua New Guinea

See full details
Abt Global

Legal Drafter, Solicitor General’s Office - Institutional Partnerships Program

Posted
23 January 2025 02:27pm
Apply by
15/02/2025
Regions
Pacific
Sectors
Administration
Communications
Effective Governance
Summary

Fiji Program Support Platform (FPSP)

  • Base in Suva, Fiji
  • Commencing in February/March 2025 to 30 September 2025
  • Open for International and National applications

FPSP Overview:

FPSP, also referred to as the ‘Platform’, a Department of Foreign Affairs and Trade (DFAT) investment, will contribute to the delivery of Fiji’s national development priorities, in line with the Australia’s International Development Policy, the Fiji-Australia Vuvale Partnership and the Development Partnership Plan.  

The Platform will deliver key bilateral programs, such as health, education, scholarships, social infrastructure, governance, climate and emergency preparedness and response. Platform activities will identify and address climate risks, promote climate action, and gender equality, disability and social inclusion (GEDSI) across and beyond the sector programs. 

  1. The Platform has three functional Outcomes:  
    The Platform has delivered its sector program outcomes, including through supporting strategic coherence, planning, partnerships management, data and learning across the portfolio of investments. 
  2. The Platform has prioritised gender equality, disability-inclusive development, and climate and disaster resilience, in its systems and practices. This includes in how it undertakes sector programming and its engagement with selected Government of Fiji (GoF) agencies. 
  3. The Platform administers timely and efficient programming that is: value for money; maximises use of local supply chains; and supports good governance, and public diplomacy, effective decision making and risk management. 

IPP Overview:

The Institutional Partnerships Program partners with the Government of Fiji (GoF) to deliver assistance in targeted areas where Australia is well placed to support Fiji’s democratic and economic resilience: through government twinning partnerships, technical assistance and grants that can be mobilised quickly to support Fiji’s ongoing stability, prosperity, and resilience to shocks.

See full details

Advanced Search

Regions

  • Pacific

Countries

  • Fiji
  • Papua New Guinea
  • Solomon Islands

Sector

  • Administration
  • Communications
  • Effective Governance
  • Infrastructure and Trade Facilitation

Skillsets

  • Construction
  • Disability
  • Economics
  • Governance
  • Humanitarian/Emergency
  • Law and Justice
  • Public Finance

Contract type

  • Employing
  • Sub-contracting

Work arrangements

  • Desk based
  • Flexible
  • (-) In country

Work type

  • Full-time

Close date

  • 2025-06-06
  • 2025-06-05
  • 2025-06-04
  • 2025-06-03
  • 2025-05-31
  • 2025-05-30
  • 2025-05-29
  • 2025-05-28
  • 2025-05-27
  • 2025-05-23
  • 2025-05-22
  • 2025-05-21
  • 2025-05-19
  • 2025-05-15
  • 2025-05-13
  • 2025-05-12
  • 2025-05-11
  • 2025-05-10
  • 2025-05-06
  • 2025-05-05
  • 2025-05-02
  • 2025-04-30
  • 2025-04-29
  • 2025-04-28
  • 2025-04-27
  • 2025-04-25
  • 2025-04-24
  • 2025-04-23
  • (-) 2025-04-22
  • 2025-04-21
  • 2025-04-20
  • 2025-04-18
  • 2025-04-15
  • 2025-04-14
  • 2025-04-13
  • 2025-04-11
  • 2025-04-10
  • 2025-04-09
  • 2025-04-06
  • 2025-04-04
  • 2025-04-03
  • 2025-04-02
  • 2025-04-01
  • 2025-03-31
  • 2025-03-30
  • 2025-03-28
  • 2025-03-27
  • 2025-03-25
  • 2025-03-24
  • 2025-03-21
  • 2025-03-18
  • 2025-03-17
  • 2025-03-15
  • 2025-03-14
  • 2025-03-12
  • 2025-03-11
  • 2025-03-10
  • 2025-03-09
  • 2025-03-07
  • 2025-03-06
  • 2025-03-05
  • 2025-03-04
  • 2025-03-03
  • 2025-03-02
  • 2025-02-28
  • 2025-02-26
  • 2025-02-25
  • 2025-02-24
  • 2025-02-23
  • 2025-02-21
  • 2025-02-19
  • 2025-02-18
  • 2025-02-17
  • 2025-02-16
  • (-) 2025-02-15
  • 2025-02-14
  • 2025-02-13
  • 2025-02-12
  • 2025-02-11
  • 2025-02-09
  • 2025-02-08
  • 2025-02-07
  • 2025-02-05
  • 2025-02-04
  • 2025-02-03
  • 2025-02-02
  • 2025-01-31
  • 2025-01-29
  • 2025-01-28
  • 2025-01-27
  • 2025-01-26
  • 2025-01-25
  • 2025-01-24
  • 2025-01-22
  • 2025-01-20
  • 2025-01-19
  • 2025-01-17
  • 2025-01-15
  • 2025-01-13
  • 2025-01-12
  • 2025-01-11
  • 2025-01-10
  • 2025-01-08
  • 2025-01-06
  • 2025-01-05
  • 2025-01-04
  • 2025-01-03
  • 2025-01-02
  • 2025-01-01
  • 2024-12-31
  • 2024-12-30
  • 2024-12-27
  • 2024-12-22
  • 2024-12-20
  • 2024-12-18
  • 2024-12-15
  • 2024-12-12
  • 2024-12-10
  • 2024-12-09
  • 2024-12-08
  • 2024-12-06
  • 2024-12-03
  • 2024-12-02
  • 2024-12-01
  • 2024-11-28
  • 2024-11-27
  • 2024-11-26
  • 2024-11-25
  • 2024-11-22
  • 2024-11-21
  • 2024-11-20
  • 2024-11-19
  • 2024-11-18
  • 2024-11-17
  • 2024-11-15
  • 2024-11-14
  • 2024-11-13
  • 2024-11-12
  • 2024-11-11
  • 2024-11-06
  • 2024-11-05
  • 2024-11-04
  • 2024-11-03
  • 2024-11-01
  • 2024-10-31
  • 2024-10-30
  • 2024-10-29
  • 2024-10-25
  • 2024-10-23
  • 2024-10-20
  • 2024-10-18
  • 2024-10-16
  • 2024-10-15
  • 2024-10-14
  • 2024-10-13
  • 2024-10-11
  • 2024-10-09
  • 2024-10-08
  • 2024-10-07
  • 2024-10-06
  • 2024-10-04
  • 2024-10-03
  • 2024-10-02
  • 2024-10-01
  • 2024-09-30
  • 2024-09-29
  • 2024-09-27
  • 2024-09-25
  • 2024-09-23
  • 2024-09-22
  • 2024-09-21
  • 2024-09-20
  • 2024-09-19
  • 2024-09-18
  • 2024-09-16
  • 2024-09-15
  • 2024-09-13
  • 2024-09-12
  • 2024-09-11
  • 2024-09-09
  • 2024-09-08
  • 2024-09-06
  • 2024-09-03
  • 2024-09-02
  • 2024-09-01
  • 2024-08-31
  • 2024-08-30
  • 2024-08-29
  • 2024-08-27
  • 2024-08-26
  • 2024-08-25
  • 2024-08-23
  • 2024-08-21
  • 2024-08-17
  • 2024-08-15
  • 2024-08-14
  • 2024-08-10
  • 2024-08-09
  • 2024-08-07
  • 2024-08-06
  • 2024-08-05
  • 2024-08-04
  • 2024-08-01
  • 2024-07-31
  • 2024-07-30
  • 2024-07-29
  • 2024-07-28
  • 2024-07-26
  • 2024-07-24
  • 2024-07-23
  • 2024-07-17
  • 2024-07-16
  • 2024-07-15
  • 2024-07-14
  • 2024-07-10
  • 2024-07-08
  • 2024-07-07
  • 2024-07-03
  • 2024-07-02
  • 2024-06-30
  • 2024-06-26
  • 2024-06-24
  • 2024-06-22
  • 2024-06-21
  • 2024-06-20
  • 2024-06-19
  • Reset

Main navigation

  • FAQs
  • Advertise an opportunity
  • LinkedIn DFAT Supplier Network
  • Contact us

User account menu

  • Log in