Skip to main content
Home Home
AusConnect
connecting people and partners across the Australian Development Program

Breadcrumb

  1. Home
  2. Opportunities Archive
Adam Smith International

Bloody Ridge National Park Construction EOI

Posted
8 April 2025 10:42am
Apply by
22/04/2025
Regions
Pacific
Sectors
Infrastructure and Trade Facilitation
Summary

Subject: Invitation to Submit an Expression of Interest (EOI) for the construction of key infrastructure at the
Bloody Ridge National Park


Introduction
The Ministry of Culture and Tourism (MCT) of the Solomon Islands and Australia’s Strongim Bisnis invites your esteemed company to submit an Expression of Interest (EOI) for the construction of key infrastructure at the Bloody Ridge National Park. This project aims to enhance the historical significance of the site while providing modern facilities to visitors.


Project Overview
The Bloody Ridge National Park is undergoing a significant development phase that includes the construction of key infrastructure:
1. Water Supply (borehole with water tower)
2. Visitor Ablution Block
3. Visitor Shelters
4. Guardhouse/Park office

Scope of Work
The selected construction firm will be responsible for:
1. Site preparation: Clearing and leveling designated areas, ensuring proper groundwork for construction in accordance with project specifications.
2. Foundation and structural work: Excavating, pouring concrete, and constructing structural element as per the approved building plans.
3. Building construction: Assembling and erecting buildings and facilities using specified materials and construction methods.
4. Adherence to plans and standards: Following architectural and engineering designs, ensuring compliance with building codes, safety regulations, and MCT’s specifications.
5. Project cleanup and handover: Removing construction debris, conducting final inspections, and ensuring the site is ready for use upon project completion.
6. Cultural and historical sensitivity: Constructing facilities with respect to the historical significance of Bloody Ridge National Park, following guidelines that preserve its heritage.

Key Deliverables
• Water Supply: Installation of a borehole and water tower connected to the security hut and ablution block. (Note: The borehole drilling will be done by the Ministry of Mines, Energy & Rural Electrification in collaboration with the Ministry of Culture and Tourism).
• Visitor Ablution Block: A well-constructed, visually attractive restroom facility with appropriate plumbing and sanitation systems.
• Two large Visitor Shelters: Sturdy, weather-resistant shelters designed to provide shade and comfort for park visitors.
• Guardhouse/Park office with adjoining restroom: A secure, durable structure to accommodate park rangers, ensuring controlled access and site safety.

 

 

See full details
DT Global

Consultancy Services for Disability Research Study

Posted
14 March 2025 12:28pm
Apply by
22/04/2025
Regions
Pacific
Sectors
Infrastructure and Trade Facilitation
Summary

Location: Port Moresby, Papua New Guinea

See full details
Tetra Tech International

Aus4Skills - RFT - AASC in Strategic Analysis and Analytical Writing

Posted
17 July 2024 02:03pm
Apply by
05/08/2024
Regions
South-East and East Asia
Sectors
Education
Summary

Tetra Tech International Development Pty Ltd (Tetra Tech International Development) as the managing contractor of the Aus4Skills Program on behalf of the Australian Department of Foreign Affairs and Trade in Vietnam, is seeking proposals from service providers to design and deliver:

  • an Australia Awards Short Course in Strategic Analysis and Analytical Writing for Vietnamese and Lao Government Officials, and
  • a four-day Training in Enhancing Strategic Forecasting and Planning Capacities for Vietnamese Government Officials (the “Activities”).

A detailed description of the Activities is included in Part B, Scope of Services.
It is intended that a single organisation (either alone or as the lead of a consortium) be contracted to design and deliver the Activities.

Aus4Skills will exclude proposals from entities on the grounds of bankruptcy, insolvency, false declarations, or significant deficiencies in performance of any substantive requirement or obligation under a prior contract with Tetra Tech International Development or Aus4Skills.

See full details

Advanced Search

Regions

  • Pacific
  • South-East and East Asia

Countries

  • Papua New Guinea
  • Solomon Islands
  • Vietnam

Sector

  • Education
  • Infrastructure and Trade Facilitation

Skillsets

  • Construction
  • Disability
  • Education
  • Humanitarian/Emergency

Contract type

  • Employing
  • Sub-contracting

Work arrangements

  • Flexible
  • (-) In country

Work type

  • Full-time

Close date

  • 2025-06-06
  • 2025-06-05
  • 2025-06-04
  • 2025-06-03
  • 2025-05-31
  • 2025-05-30
  • 2025-05-29
  • 2025-05-28
  • 2025-05-27
  • 2025-05-23
  • 2025-05-22
  • 2025-05-21
  • 2025-05-19
  • 2025-05-15
  • 2025-05-13
  • 2025-05-12
  • 2025-05-11
  • 2025-05-10
  • 2025-05-06
  • 2025-05-05
  • 2025-05-02
  • 2025-04-30
  • 2025-04-29
  • 2025-04-28
  • 2025-04-27
  • 2025-04-25
  • 2025-04-24
  • 2025-04-23
  • (-) 2025-04-22
  • 2025-04-21
  • 2025-04-20
  • 2025-04-18
  • 2025-04-15
  • 2025-04-14
  • 2025-04-13
  • 2025-04-11
  • 2025-04-10
  • 2025-04-09
  • 2025-04-06
  • 2025-04-04
  • 2025-04-03
  • 2025-04-02
  • 2025-04-01
  • 2025-03-31
  • 2025-03-30
  • 2025-03-28
  • 2025-03-27
  • 2025-03-25
  • 2025-03-24
  • 2025-03-21
  • 2025-03-18
  • 2025-03-17
  • 2025-03-15
  • 2025-03-14
  • 2025-03-12
  • 2025-03-11
  • 2025-03-10
  • 2025-03-09
  • 2025-03-07
  • 2025-03-06
  • 2025-03-05
  • 2025-03-04
  • 2025-03-03
  • 2025-03-02
  • 2025-02-28
  • 2025-02-26
  • 2025-02-25
  • 2025-02-24
  • 2025-02-23
  • 2025-02-21
  • 2025-02-19
  • 2025-02-18
  • 2025-02-17
  • 2025-02-16
  • 2025-02-15
  • 2025-02-14
  • 2025-02-13
  • 2025-02-12
  • 2025-02-11
  • 2025-02-09
  • 2025-02-08
  • 2025-02-07
  • 2025-02-05
  • 2025-02-04
  • 2025-02-03
  • 2025-02-02
  • 2025-01-31
  • 2025-01-29
  • 2025-01-28
  • 2025-01-27
  • 2025-01-26
  • 2025-01-25
  • 2025-01-24
  • 2025-01-22
  • 2025-01-20
  • 2025-01-19
  • 2025-01-17
  • 2025-01-15
  • 2025-01-13
  • 2025-01-12
  • 2025-01-11
  • 2025-01-10
  • 2025-01-08
  • 2025-01-06
  • 2025-01-05
  • 2025-01-04
  • 2025-01-03
  • 2025-01-02
  • 2025-01-01
  • 2024-12-31
  • 2024-12-30
  • 2024-12-27
  • 2024-12-22
  • 2024-12-20
  • 2024-12-18
  • 2024-12-15
  • 2024-12-12
  • 2024-12-10
  • 2024-12-09
  • 2024-12-08
  • 2024-12-06
  • 2024-12-03
  • 2024-12-02
  • 2024-12-01
  • 2024-11-28
  • 2024-11-27
  • 2024-11-26
  • 2024-11-25
  • 2024-11-22
  • 2024-11-21
  • 2024-11-20
  • 2024-11-19
  • 2024-11-18
  • 2024-11-17
  • 2024-11-15
  • 2024-11-14
  • 2024-11-13
  • 2024-11-12
  • 2024-11-11
  • 2024-11-06
  • 2024-11-05
  • 2024-11-04
  • 2024-11-03
  • 2024-11-01
  • 2024-10-31
  • 2024-10-30
  • 2024-10-29
  • 2024-10-25
  • 2024-10-23
  • 2024-10-20
  • 2024-10-18
  • 2024-10-16
  • 2024-10-15
  • 2024-10-14
  • 2024-10-13
  • 2024-10-11
  • 2024-10-09
  • 2024-10-08
  • 2024-10-07
  • 2024-10-06
  • 2024-10-04
  • 2024-10-03
  • 2024-10-02
  • 2024-10-01
  • 2024-09-30
  • 2024-09-29
  • 2024-09-27
  • 2024-09-25
  • 2024-09-23
  • 2024-09-22
  • 2024-09-21
  • 2024-09-20
  • 2024-09-19
  • 2024-09-18
  • 2024-09-16
  • 2024-09-15
  • 2024-09-13
  • 2024-09-12
  • 2024-09-11
  • 2024-09-09
  • 2024-09-08
  • 2024-09-06
  • 2024-09-03
  • 2024-09-02
  • 2024-09-01
  • 2024-08-31
  • 2024-08-30
  • 2024-08-29
  • 2024-08-27
  • 2024-08-26
  • 2024-08-25
  • 2024-08-23
  • 2024-08-21
  • 2024-08-17
  • 2024-08-15
  • 2024-08-14
  • 2024-08-10
  • 2024-08-09
  • 2024-08-07
  • 2024-08-06
  • (-) 2024-08-05
  • 2024-08-04
  • 2024-08-01
  • 2024-07-31
  • 2024-07-30
  • 2024-07-29
  • 2024-07-28
  • 2024-07-26
  • 2024-07-24
  • 2024-07-23
  • 2024-07-17
  • 2024-07-16
  • 2024-07-15
  • 2024-07-14
  • 2024-07-10
  • 2024-07-08
  • 2024-07-07
  • 2024-07-03
  • 2024-07-02
  • 2024-06-30
  • 2024-06-26
  • 2024-06-24
  • 2024-06-22
  • 2024-06-21
  • 2024-06-20
  • 2024-06-19
  • Reset

Main navigation

  • FAQs
  • Advertise an opportunity
  • LinkedIn DFAT Supplier Network
  • Contact us

User account menu

  • Log in