Adam Smith International

Bloody Ridge National Park Construction EOI

Posted
8 April 2025 10:42am
Apply by
Regions
Pacific
Sectors
Infrastructure and Trade Facilitation
Summary

Subject: Invitation to Submit an Expression of Interest (EOI) for the construction of key infrastructure at the
Bloody Ridge National Park


Introduction
The Ministry of Culture and Tourism (MCT) of the Solomon Islands and Australia’s Strongim Bisnis invites your esteemed company to submit an Expression of Interest (EOI) for the construction of key infrastructure at the Bloody Ridge National Park. This project aims to enhance the historical significance of the site while providing modern facilities to visitors.


Project Overview
The Bloody Ridge National Park is undergoing a significant development phase that includes the construction of key infrastructure:
1. Water Supply (borehole with water tower)
2. Visitor Ablution Block
3. Visitor Shelters
4. Guardhouse/Park office

Scope of Work
The selected construction firm will be responsible for:
1. Site preparation: Clearing and leveling designated areas, ensuring proper groundwork for construction in accordance with project specifications.
2. Foundation and structural work: Excavating, pouring concrete, and constructing structural element as per the approved building plans.
3. Building construction: Assembling and erecting buildings and facilities using specified materials and construction methods.
4. Adherence to plans and standards: Following architectural and engineering designs, ensuring compliance with building codes, safety regulations, and MCT’s specifications.
5. Project cleanup and handover: Removing construction debris, conducting final inspections, and ensuring the site is ready for use upon project completion.
6. Cultural and historical sensitivity: Constructing facilities with respect to the historical significance of Bloody Ridge National Park, following guidelines that preserve its heritage.

Key Deliverables
• Water Supply: Installation of a borehole and water tower connected to the security hut and ablution block. (Note: The borehole drilling will be done by the Ministry of Mines, Energy & Rural Electrification in collaboration with the Ministry of Culture and Tourism).
• Visitor Ablution Block: A well-constructed, visually attractive restroom facility with appropriate plumbing and sanitation systems.
• Two large Visitor Shelters: Sturdy, weather-resistant shelters designed to provide shade and comfort for park visitors.
• Guardhouse/Park office with adjoining restroom: A secure, durable structure to accommodate park rangers, ensuring controlled access and site safety.

 

 

Description

Evaluation Criteria
EOIs will be evaluated based on the following criteria:
• Successful clearance on due diligence and reference checks.
• Examples of relevant experience in similar projects outlining the scope, value and client.
• Understanding of the cultural and environmental context.
• Financial and resource capacity to deliver the project on time and within budget.

 

Submission Details
Interested companies are requested to submit their EOI by Tuesday 22nd April to Bjorn Svensson BSvensson@tourism.gov.sb and/or Joan Sautehi JSautehi@tourism.gov.sb and copying Strongim Bisnis Kencliz Soqoilo - Kencliz.Soqoilo@strongimbisnis.com.sb.
 

The submission should include:
• Cover letter
• Company profile
• Description of relevant experience related to public infrastructure
• Contact information for three references for previous work


Contact Information
For further details or to arrange a site visit, please contact:
Bjorn Svensson BSvensson@tourism.gov.sb and Joan Sautehi JSautehi@tourism.gov.sb.


Conclusion
We look forward to receiving your Expression of Interest and exploring the potential of your company to
contribute to this project.